Recovery Strategies
Recovery Strategy for the Phantom Orchid (Cephalanthera austiniae) in Canada
The Minister of Environment and Climate Change is the competent minister under SARA for the Phantom Orchid and has prepared the federal component of this recovery strategy (Part 1), as per section 37 of SARA. To the extent possible, it has been prepared in cooperation with the Province of British Columbia as per section 39(1) of SARA. SARA section 44 allows the Minister to adopt all or part of an existing plan for the species if it meets the requirements under SARA for content (sub-sections 41(1) or (2)). The Province of British Columbia provided the attached recovery plan for Phantom Orchid (Part 2) as science advice to the jurisdictions responsible for managing the species in British Columbia. It was prepared in cooperation with Environment and Climate Change Canada.
Consultation period: 2018-03-28 to 2018-05-27
File(s)
- HTML version of "Recovery Strategy for the Phantom Orchid (Cephalanthera austiniae) in Canada [Final version]"
- "Recovery Strategy for the Phantom Orchid (Cephalanthera austiniae) in Canada [Final version]" (2020-03-26) (PDF format, 2,146.00 KB)
- HTML version of "Recovery Strategy for the Phantom Orchid (Cephalanthera austiniae) in Canada [Proposed]"
- "Recovery Strategy for the Phantom Orchid (Cephalanthera austiniae) in Canada [Proposed]" (2018-03-28) (PDF format, 4,360.97 KB)
Contact Person(s)
Recovery Planning
Environment and Climate Change Canada
15th Floor, Place Vincent Massey
351 St. Joseph Boulevard
Gatineau, QC
K1A 0H3
Send e-mail
Related Species
Links
- No links available.
- Date modified: