Recovery Strategies
Recovery Strategy for the Chestnut-collared Longspur (Calcarius ornatus) in Canada
The Minister of Environment and Climate Change and Minister responsible for Parks Canada Agency is the competent minister under SARA for the Chestnut-collared Longspur and has prepared this strategy, as per section 37 of SARA. To the extent possible, it has been prepared in cooperation with the Government of Alberta, as per section 39(1) of SARA.
The Recovery Strategy for the Chestnut Collared Longspur was modified in February 2018 to name the national wildlife area in which critical habitat is found (Prairie National Wildlife Area (Unit No. 11)).
Consultation period: 2016-03-30 to 2016-05-29
File(s)
- HTML version of "Amended Recovery Strategy for the Chestnut- collared Longspur (Calcarius ornatus) in Canada"
- "Amended Recovery Strategy for the Chestnut- collared Longspur (Calcarius ornatus) in Canada" (2018-02-12) (PDF format, 2,466.00 KB)
- HTML version of "Recovery Strategy for the Chestnut-collared Longspur (Calcarius ornatus) in Canada [Final version]"
- "Recovery Strategy for the Chestnut-collared Longspur (Calcarius ornatus) in Canada [Final version]" (2017-11-24) (PDF format, 2,464.90 KB)
- HTML version of "Recovery Strategy for the Chestnut-collared Longspur (Calcarius ornatus) in Canada [Proposed]"
- "Recovery Strategy for the Chestnut-collared Longspur (Calcarius ornatus) in Canada [Proposed]" (2016-03-30) (PDF format, 2,456.58 KB)
Contact Person(s)
Recovery Planning
Environment and Climate Change Canada
15th Floor, Place Vincent Massey
351 St. Joseph Boulevard
Gatineau, QC
K1A 0H3
Send e-mail
Related Species
Links
- No links available.
- Date modified: